Why a Building Permit?

The purpose behind building codes is to give reasonable assurance that a home is safe from structural failure, fire hazards from electrical and heating systems, electrical shock, and health risks.  In Meeting the City's Planning and Zoning requirements, residents are provided protection from undesirable building activity in their neighborhoods that may encroach upon their property rights or result in degenerative property values.  The permits provide a permanent record of the work performed and inspections conducted on the project.

 

Permit Fees

Less than $50

No Fee
$50 - $100 $1.00
$100 - $200 $2.00
$200 - $300 $3.00
$300 - $400 $4.00
$400 - $500 $5.00
$500 - $600 $6.00
$600 - $700 $7.00
$700 - $1000 $9.00
$1000 - $2000 $12.00
$2000 - $3000 $15.00
$3000 - $4000 $18.00
$4000 and over $18.00 plus $2.00 per thousand over
   
(City of Marceline Code of Ordinances Title V, Chapter 500, Section 500.090(C)

               

                        

Location Hours Contact

116 N. Main Street USA

Marceline, MO 64658

Monday - Friday

8 am - 5 pm

Phone:  (660) 376-3528

Fax:  (660) 376-3898


 

Forms
Building Permit Application - New Construction
Building Permit Application - General
Demolition Permit Application

 

New Construction

 

A Building Permit Application for new construction should be submitted for all new residential dwelling, commercial building, and detached accessory structure construction.  Stamped blueprints by the architect, design elevations and certificate of insurance (general liability with City named as additional insured) must be attached to the permit application for consideration.  No work may begin prior to issuance of a permit and may be subject to a Marceline Planning and Zoning Hearing if it is determined that any portion of the application requires a variance or special use.  Please allow up to 3 business days for processing and review.

 

General Construction / Renovation

 

A Building Permit Application for general construction should be submitted for roofing, fencing, sidewalks, carports, sheds, and construction involving structural modification to an existing structure.   No work may begin prior to issuance of a permit and may be subject to a Marceline Planning and Zoning Hearing if it is determined that any portion of the application requires a variance or special use.  Please allow up to 3 business days for processing and review.

 

Demolition

 

A Demolition Permit is required for all planned demolition of any residential dwelling or commercial business structure, whether full or partial.  The permit is valid for a period of 90 days from issuance.  Residential dwellings located in the R-1 (Residential) Zoning District are exempt from the "Minimum Lot Area" and "Minimum Lot Frontage" requirements for new home construction if a prior existing home is demolished within 1 year of permit issuance.  There is no fee for this permit.